Jeudi 26 mai 2011

Crazy! Louis vuitton sale

Crazy! Louis vuitton sale

Louis VuittonSoutheast Network - Strait Metropolis Daily News May 26 (Ben Wang Li Jin) reporter learned yesterday, Fuzhou City Parking Management Ltd Tracker Fuzhou, the city plans to promote the "metered parking", the city will gradually remaining road parking To achieve "electronic toll

 

Louis Vuitton outletmanagement. " It is understood that most of the section of parking meters to be installed, according to two sections of parking standards, as early as late 22:00 to 7 am the following day parking charge, 24 hours maximum charge of 20 yuan. Parking meters in the city to promote It is understood that the Tracker parking company authorized by the municipal government, starting

 

Louis Vuitton bagsfrom January this year, in the urban areas to implement electronic toll road parking space management. Currently, the company has been in a bustling section (including the Strand, Jin Tai Road, Hot Springs Plaza Road, Aquatic Park road, Ya Road, Lane) has installed 113 meters, the management of 214 berths; in two sections (including the six-way , Jinan Road, Furuta Road, Furuta slip, Harbour Road) to install 135 units meter, the management of 254 berths. According to the plan, the city remaining road parking space will be gradually implemented electronic toll management, will be installed meter track sections, including Camp Road, Ye Shan

 Louis vuittonRoad, Pingtung Road, Qin Wu and other secondary roads. 22:00 to 7 pm the following day parking free of charge It is understood that most of the parking meters to be installed are two sections of the standard fees and charges hours (7:00 to 22:00) in a parking charge 2 yuan for every 30 minutes, the same 24-hour maximum charge of 20 berths Dollars. 22:00 the next day at 7 hours when no charge. Person in charge of parking companies, parking meter berth extension, the city is two sections of road charges is expected to account for more than 80% of the city's roads. Arrears of Traffic Management It is understood that for the current number of "metered parking" section appears in the "malicious evasion"phenomenon, Traffic and Patrol Police Department will participate in governance. According to reports, "Fuzhou road parking management measures"were promulgated, the relevant departments to deploy officers specifically malicious evasion condition of the vehicles on the registration, investigation, evidence collection. Fuzhou Traffic Police Detachment in accordance with the "management approach"requirements,

Look! Funny five finger shoes

Look! Funny five finger shoes

barefoot shoesDaily News (trainee reporter Zhang Ding) traffic police department has decided to May 25 and 26, 6:45-8:30 and 16:30-18:30 every two hours on an elevated north-south end of the trial limit Measures, including north to south, in the morning and evening peak hours on the pond closed

 

five finger shoeslane elevated bridge approach north to south, and south on the northbound ramp closure luck; and south to the north, closed the morning and evening peak hours south to the north bridge approach lane elevated age, the highest mountain tunnel junction south south North catchy. However, the reporter learned yesterday from the traffic police department, was prepared to try

 

five fingers shoesthe two-day limiting measures, before the peak in the late yesterday has been canceled, the original can be properly closed into a few entrance. According to report, the traffic police had to consider closure of the 4 entrances, mainly on account of the beginning of the elevated section of the flow began to ease elevated. Especially in the morning and evening peak hours, can effectively alleviate the congestion from the source state. Limiting effects of such measures in the end do? Yesterday, members of the public driving through elevated to reporters reflect the past, early peak north to south direction, vehicle queue section of the north need to

 

five finger shoesrouted to mark yesterday, only routed to the interchange on the north of Germany; and south of the interchange are reduced to a revival of the south, and Access significantly faster. However, ground-related road yesterday morning was busy again. For example, the north of the city on the toro, through benefits and roads, these roads are not usually busy during peak hours, it emerged yesterday queuing traffic situation. The south was even more serious, especially Bin Wen Road, Bin Kang Road, and several other times can be elevated on the hole, even a large backlog of vehicles, road conditions on the ground. This was originally required 25, 26 days trial measures the peak morning and evening, to peak until late yesterday afternoon, the traffic police department issued a notice on the Internet suddenly, "as does not affect public transportation, evening peak today and tomorrow will be the pilot limiting measures Cancel. " As for the future will not be introduced measures to ease the congestion of the trial, it is not yet disclosed.

première page «

Recherche sur NoxBlog

Connexion à NoxBlog.com

Nom d'utilisateur
Mot de passe
Toujours connecté
 

Inscription sur NoxBlog


Adresse du blog
.noxblog.com

Mot de passe

Confirmation

Adresse email valide

Code de sécurité anti-spam

Code anti-bot

J'accepte les conditions d'utilisation de NoxBlog.com